Home > Media Centre > Case Studies
Wellington College Memorial Hall - Alan Gibbs CentreA cornerstone of Wellington College and the community, the newly rebuilt Wellington College Memorial Hall & Performing Arts Centre is a grand and welcoming structure that conveys the spirit of the old hall before it.
Wellington College needed a larger hall to accommodate its increasing school roll. The initial brief aimed to largely retain the old school hall ...read or print the full case study. |
![]() |
Auckland International Airport - Departure Terminal RedevelopmentDriven by Auckland Airport’s goal to be future-ready, the transformational International Terminal Expansion project is an important milestone in its journey to increase the Airport’s annual capacity.
The project has almost doubled the size of the departure processing zone, reconfiguring the landside farewell area; building a new ....read or print the full case study. |
![]() |
Patton Engineering - Careers in SteelBridging the skills gap - one region at a timeWith a shortage of skilled candidates in the trade sector, combined with an increasingly ageing workforce, many businesses are urgently calling out for skilled labour across New Zealand. One innovative Hastings-based business has embarked on an ambitious programme to address the nationwide skills shortage, one region at a time. Read about the programme that Patton Engineering is currently involved in and the success it has become by clicking here. |
![]() |
Iconic Wellington Building set New Standard for Steel Innovation20 Customhouse Quay is a new 14-level seismically advanced office tower on the side of the old BP House on Wellington's waterfront.It has become an iconic Wellington building due to its prominent position, and its distinctive and innovative diagrid steel structure. Wellington-based structural steel contractor....read or print the full case study. |
![]() 20 Customhouse Quay |
University of Waikato: Law School & Management Studies BuildingCompleted in 2017, the bold structure of the new tower is an unmissable and fitting gateway to Te Piringa, which houses the Faculty of Law, Waikato Management School’s Centre for Corporate and Executive Education, and student services.The opening of this $35 million state-of-the-art campus facility marked the University’s 50th anniversary and was a welcome addition for the law faculty, which has been housed....read or print the full case study. |
![]() UoW, Law School & Management Studies Building |
Canada Street Bridge
The award-winning Canada Street Bridge is a world-first: it’s the only curved, triangular orthotropic steel bridge of its kind. |
![]() Canada Street Bridge |
Rutherford Regional Science and Innovation Centre, University of CanterburyThe $216 million Rutherford Regional Science and Innovation Centre (RRSIC) will be the cornerstone of the University of Canterbury’s Science Precinct. The state-of-the- art facilities will be a focal point for the University’s science and innovation network and foster collaborative teaching, learning and research. The RRSIC project is two buildings, the first of which is being built by Fletcher Construction and is a 25,000m seismically engineered steel structure that includes specialist teaching.....read or print the full case study. |
![]() RRSIC, University of Canterbury |
PwC Centre, ChristchurchThe PwC Centre is a striking new landmark for Christchurch, both day and night. The $30 million, five-storey office building is primarily a steel structure with a composite flooring system. The resilient, lightweight and economic building offers enhanced seismic performance with the use of buckling restrained brace (BRB) technology.The building is an importance level 3 building, which means it has been designed to 130 percent of the building code to create a safe working environment for tenants and visitors....read or print the full case study. |
![]() PwC Centre, Christchurch
|
University of Auckland, Science TowerIn 2010 the University of Auckland embarked on a five-year project to upgrade its Faculty of Science buildings. The $290 million redevelopment consisted of the refurbishment and seismic strengthening of two existing buildings, construction of a new link structure, and demolition of two buildings to make way for the new Science Centre Tower.The result: a state-of-the-art research and teaching facility, and a new entranceway to the University...read or print the full case study. |
![]() UoA, Science Tower |